ChemSpeed

Custom Text 
Suitable for horizontal or formed vertical applications and may be extended up to 60% for deep placements.

Uses

  • Structural filling holes subject to heavy traffic including concrete decks, bridges and roadways.
  • Filling of dowel bar slots across transverse cracks in highway pavements (Dowel Bar Retrofit).
  • Fast setting repairs to high load concrete such as loading docks and industrial floors.
  • Repairs adjacent to construction and expansion joints.


Advantages

  • Initial set in 25 - 30 minutes at 72°F
  • Repairs from 0.50 inch (1.3 cm) to full depth.
  • Non shrink for exceptional bond strength.
  • High early strength gaining 2500 PSI in 1 hour at 72°F
  • May be placed at temperatures down to 40°F if ACI 306 cold weather concreting standards are followed.
  • Accepts rubber wheeled traffic over road surfaces or industrial facilities in one hour.
  • Resists freeze - thaw cycles and deicing chemicals
  • May be extended for economical placement at depths greater than 1.5 inches (4cm).