Suitable for horizontal or formed vertical applications and may be extended up to 60% for deep placements.
Uses
- Structural filling holes subject to heavy traffic including concrete decks, bridges and roadways.
- Filling of dowel bar slots across transverse cracks in highway pavements (Dowel Bar Retrofit).
- Fast setting repairs to high load concrete such as loading docks and industrial floors.
- Repairs adjacent to construction and expansion joints.
Advantages
- Initial set in 25 - 30 minutes at 72°F
- Repairs from 0.50 inch (1.3 cm) to full depth.
- Non shrink for exceptional bond strength.
- High early strength gaining 2500 PSI in 1 hour at 72°F
- May be placed at temperatures down to 40°F if ACI 306 cold weather concreting standards are followed.
- Accepts rubber wheeled traffic over road surfaces or industrial facilities in one hour.
- Resists freeze - thaw cycles and deicing chemicals
- May be extended for economical placement at depths greater than 1.5 inches (4cm).